English
Brownsville–Matamoros

MatamorosandBrownsville

Gateway International BridgeBorder wait times

Direction
Passenger · Standard
Traveling by
Lane type

Travel mode

Entering the U.S.

Latest official wait for Gateway International Bridge

Current wait

Passenger

Stale report

Reported 1 hr 46 min ago by CBP · Stale

Details

Reporting details

Last reported: 5 min at
Feed-check details

CBP feed checked · Updates roughly hourly

Crossing facts

Hours
24 hours
Lanes reported
car General / Ready; pedestrian General / Ready
Commercial trucks
not served — use Veterans or Los Indios
Toll
southbound schedule below
Contact
510 E. 14th Street; 956-574-8767

About this crossing

Gateway is downtown Brownsville's main walking bridge into Matamoros — 24 hours, with covered pedestrian walkways and four live readings: General and Ready for both cars and walkers. (Not to be confused with Gateway to the Americas in Laredo.)

Tolls

Southbound (into Mexico) — Cameron County bridge system (checked 29 August 2026): car, pickup or motorcycle US$5, or US$4.75 with the AVI account · pedestrian US$1 · extra passenger axle US$3. The county table's bicycle (US$1) and bus/RV (US$10) rows are system-wide price classes — their eligibility at Gateway is not established. AVI is a toll account, not a CBP program.

Construction

GSA broke ground on the Gateway port modernization in May 2026, with completion anticipated late 2029 — new pedestrian processing, passenger lanes and outbound space, so local routing may shift while today's lanes keep operating. A 2025 federal permit also authorizes a separate future pedestrian crossing here; nothing has opened, and today's pedestrian waits are on this bridge.

Quick answers

Is Gateway Bridge open 24 hours?

Yes — around the clock for cars and pedestrians, with four independent live readings above: General and Ready for each. B&M, the other downtown bridge, also runs 24 hours; Veterans at Los Tomates closes at midnight.

Does Gateway have SENTRI?

No — Gateway reports General and Ready waits for cars and walkers, but no SENTRI lane; Brownsville's SENTRI car wait is at Veterans, open 6 a.m. to midnight, which also carries the corridor's FAST truck lane.

Is the new Gateway pedestrian bridge open?

No — a 2025 federal permit authorizes its construction, and no opening has been announced. Today's walking waits are on the existing bridge, which reports pedestrian General and Ready around the clock.