English
San Luis–Yuma

San Luis Río Colorado and San Luis

San Luis I Border wait times

Direction
Passenger · Standard
Traveling by
Lane type

Travel mode

Entering the U.S.

Latest official wait for San Luis I

Current wait

Passenger

Moderate

40min

Reported 35 min ago by CBP

Toll: not confirmed — no current tariff located; check with the operators

Details

Reporting details

Reported

4 lanes open

No change since 9:00 PM MST

Feed-check details

CBP feed checked · Updates roughly hourly

Crossing facts

U.S.-bound hours
24 hours (CBP, port level)
Lanes reported
car General / SENTRI / Ready; pedestrian General / Ready
Ready Lane notice
6 a.m.–midnight (CBP notice; check the live lane state)
Commercial trucks
not served — use San Luis II
Toll
not confirmed — no current tariff located; check with the operators
U.S. facility
431 Main Street, San Luis

About this crossing

San Luis I is the downtown crossing between San Luis, Arizona and San Luis Río Colorado, Sonora, open 24 hours for cars and pedestrians. Commercial trucks use San Luis II, the separate cargo port east of town.

Quick answers

Is San Luis I open 24 hours?

Yes, at port level — CBP lists the crossing open around the clock for cars and pedestrians. Individual lanes keep their own schedules: CBP’s notice puts Ready Lane at 6 a.m. to midnight, and any lane can close within the port’s hours, so check the live state above.

Can commercial trucks use San Luis I?

No. This is the passenger and pedestrian port; the corridor’s trucks use San Luis II, the commercial-only crossing east of town on the SR 195 trade route. Don’t route a truck downtown on the strength of this page’s car wait.

Does San Luis I have SENTRI?

Yes — CBP reports a separate SENTRI car wait here, alongside General and Ready. SENTRI requires enrolment in CBP’s trusted-traveller program; Ready Lane takes RFID travel documents and is a different program.

SENTRI and Ready Lane

CBP reports General and SENTRI car waits, with Ready fields for both cars and pedestrians. CBP’s port notice gives Ready Lane hours of 6 a.m. to midnight — a schedule, not a promise the lane is open now, so go by the live lane state above.

The port

The port at 431 Main Street was built in 1984 and is mid-rebuild: a $355 million modernization began in May 2023, sixteen new northbound vehicle lanes opened in March 2026, and GSA projects substantial completion in spring 2029, with the port operational throughout. The City of San Luis publishes street cameras near the crossing — views only, with no wait numbers or timestamps.

Busy times

In 2025 the San Luis port handled about 3.6 million US-bound personal vehicles and 2.5 million pedestrians (port-level BTS counts covering both San Luis facilities). December was the busiest driving month.