Español
El Paso–Juárez

Ciudad JuárezandEl Paso

Bridge of the AmericasTiempos de espera fronterizos

Dirección
Vehículo particular · General
Cómo viaja
Tipo de carril

Travel mode

Entrada a Estados Unidos

Latest official wait for Bridge of the Americas

Espera actual

Vehículo particular

Reporte antiguo

Reportado hace 1 h 43 min por CBP · Reporte antiguo

  • Bridge of the Americas — aviso antiguo de CBP, 11:00 p.m. GMT-6 (texto original): BOTA Passenger/Ready Lanes is open west side of port; Passenger Hrs 24 hours/7days, BOTA CARGO Mon-FRI 6 am to 4 pm. SAT/SUN CLOSED. Tune into AM 1610 for info.
Detalles

Detalles del reporte

Último reporte: 50 min a las
Consulta a las fuentes

Última consulta a CBP: · Los reportes se actualizan aproximadamente cada hora

Crossing facts

Toll
none — verified free in both directions, all traffic
U.S.-bound hours, cars and pedestrians
24 hours
U.S.-bound hours, cargo
6 a.m.–4 p.m., Monday–Friday
Lanes reported
car General / Ready; pedestrian General / Ready; truck General / FAST
U.S. approach
I-110, connecting US 54 and I-10

About this crossing

The Bridge of the Americas — El Paso's "Free Bridge" — is the corridor's workhorse: cars, pedestrians and trucks, with no toll in either direction, the only El Paso bridge that charges nothing. Cars and pedestrians cross 24 hours; cargo runs weekdays 6 a.m. to 4 p.m., closed weekends.

Cargo, and the plan to end it

Today BOTA runs three RFID-equipped commercial lanes with General and FAST waits on weekday hours. That has an expiry date: GSA's selected modernization eliminates cargo operations at this port. No site work is underway yet — construction is scheduled for early 2028, cargo ceases when it begins, and completion is slated for summer 2031. Planned dates, not current works.

The bridge

Opened in 1967 and replaced in 1998, BOTA crosses between the Córdova/Chamizal area and I-110. The boundary commissions (IBWC and CILA) own the structure; GSA manages the U.S. port and CBP inspects.

Quick answers

Is Bridge of the Americas toll-free?

Yes — verified free in both directions for cars, pedestrians and trucks, the only toll-free El Paso bridge. Free doesn't mean fast: check the live waits, especially at peak hours.

When can commercial trucks use BOTA?

Weekdays, 6 a.m. to 4 p.m. — closed Saturday and Sunday. For evening or Saturday cargo, Ysleta runs weekdays to midnight and Saturday to 2 p.m. FAST is reported separately for enrolled carriers.

Is BOTA already under construction?

No — GSA says no site work is underway. Construction is scheduled to begin in early 2028, cargo operations cease when it does, and completion is slated for summer 2031. Planned dates that can move.