Current wait
NEXUS
Unavailablemin
Hours: 7:00 am – 11:00 pm, daily
Check the official source: Entering the U.S. · NEXUS
Ontario and New York
NEXUS shows dedicated trusted-traveller lanes where agencies report them separately.
Light · up to 15 minModerate · 16–44 minHeavy · 45 min or more
Entering the U.S.
Check your connection and try again.
NEXUS
Unavailablemin
Hours: 7:00 am – 11:00 pm, daily
Check the official source: Entering the U.S. · NEXUS
CBP feed checked · Updates roughly hourly
The Whirlpool Rapids Bridge is a double-deck steel arch that opened on 27 August 1897, spanning the Niagara gorge about 225 feet above the rapids. Its upper deck carries a single rail line used by the Amtrak and VIA Rail “Maple Leaf” service; its lower deck carries the road traffic. The Niagara Falls Bridge Commission has owned it since 1959, and also operates the Rainbow and Queenston–Lewiston bridges.
The operator dedicates this bridge to NEXUS cardholders and permits Global Entry cardholders U.S.-bound only. Everyone in a Canada-bound vehicle needs a valid NEXUS card. No commercial vehicles, pedestrians, bicycles or vehicles towing anything are allowed. Check everyone’s eligibility before choosing this crossing.
Seven in the morning to eleven at night, with two car inspection lanes in each direction. Outside that window the crossing is shut and no lane will show a wait. Plan around the hours as well as the card requirements for your direction, because either one on its own will turn you back.
NEXUS is a joint CBP and CBSA trusted-traveller programme that pre-screens applicants for expedited crossing. To apply, CBP directs travellers to call 1-866-NEXUS26 or use the Trusted Traveler Programs portal; processing includes an interview.
Canada-bound, every occupant needs a valid NEXUS card. The operator also permits Global Entry cardholders travelling into the U.S. Global Entry does not qualify for travel into Canada. Check everyone’s eligibility before choosing this bridge. The Rainbow Bridge and Queenston–Lewiston Bridge take standard traffic.
Only autos are permitted. The operator explicitly excludes commercial vehicles and trucks, pedestrians, bicycles, and anything being towed.
An enrolment centre has operated at this crossing, and it closes when the bridge does. The Bridge Commission shut both from 1 April to 5 May 2019 for overpass removal work nearby, so confirm the centre is open before travelling here for an interview.