Espera actual
Vehículo particular
Baja
5min
Toll: not confirmed — no current tariff located; check with the operators
Agua Prieta and Douglas
Vehículos particulares: autos, camionetas y vans.
Entrada a Estados Unidos
Check your connection and try again.
Vehículo particular
Baja
5min
Toll: not confirmed — no current tariff located; check with the operators
Este sitio no muestra esperas hacia México. Los reportes de CBP cubren la entrada a Estados Unidos.
More on where these numbers come from: how border wait times work.
Última consulta a CBP: · Los reportes se actualizan aproximadamente cada hora
The Raul Hector Castro crossing links Douglas, Arizona with Agua Prieta, Sonora — open 24 hours at port level for cars and pedestrians, with a commercial operation whose detailed hours need direct confirmation. A dedicated commercial port, West Douglas, is under construction west of the city; trucks move there only after it is finished.
Yes, at port level — CBP lists the record around the clock. That covers the port, not every lane: the Ready lanes showed closed at the last check, and cargo keeps its own schedule. Check the live states above.
Neither CBP nor the port publishes a Saturday cargo schedule for Douglas, and the values that circulate disagree with each other. Call the port to confirm before planning a weekend shipment.
No — it is an active construction site with no border service. GSA began building in August 2025 and anticipates substantial completion in May 2029, with commercial inspection moving there only after completion.
CBP reports General and SENTRI car waits; the Ready fields for cars and pedestrians existed but showed closed at the last published check — go by the live lane state above.
Douglas reopened for cattle imports from Mexico on 24 August 2026 — the only southern border port open for livestock imports at that notice. It is a species- and direction-specific animal-health rule that changes quickly; verify with APHIS on the day.
The port at 15 Pan American Avenue was built in 1933 and expanded in 1993. GSA’s modernization timeline runs from a winter 2026 design-build award toward substantial completion in summer 2031 — planned work, not current construction. The City of Douglas runs a traffic camera it labels a limited trial that may go offline.
In 2025 the Douglas port handled about 1.5 million US-bound personal vehicles, 1.0 million pedestrians and 26,000 trucks (port-level BTS counts). May led for cars.